card image
card image
Back to Portfolio

Marondera 250mm Irrigation Mainline Project – Marondera, Zimbabwe (October 2025)

Active

Project Overview

Installing a 250 mm diameter irrigation mainline of the irrigation water supply system. 1. Trench excavation – a linear cut has been made in the soil to accommodate the mainline. 2. Pipe laying – a 250 mm nominal diameter PVC/UPVC mainline pipe is being positioned in the trench for the irrigation system. 3. Backfilling & compaction – workers are covering the pipe with excavated material and compacting the soil to secure the line and prevent displacement. 4. Water distribution – the mainline will convey water to a 12ha pivot‑irrigated command area, feeding a central pivot damming system for agricultural irrigation. 5. Project timeline – This is slated as an October 2025 construction project, separate from other pipeline works.

Project Information

Status
Active
Created
January 2, 2026
Images
5 images

Interested in this project?

Get in touch to learn more about our work and how we can help you.

Contact Us