Midlands Borehole Irrigation Mainline Project – Midlands, Zimbabwe (November 2025)
Project Overview
Mainline excavation for an irrigation water supply system that will draw water from a borehole. The setup involves: 1. Trenching—a long, narrow trench has been dug in the red soil to lay the main water pipeline. 2. Pipeline—blue PVC pipes (110 mm) are placed in the trench to carry water from the borehole to the irrigation field. 3. Borehole connection—the pipe at the far end of the trench leads toward a borehole (not shown), which will pump groundwater into the mainline. 4. Irrigation purpose – The water will be distributed through the mainline to supply an agricultural field for crop irrigation, supporting the Midlands project scheduled for November 2025.
Project Information