card image
card image
Back to Portfolio

Midlands Borehole Irrigation Mainline Project – Midlands, Zimbabwe (November 2025)

Active

Project Overview

Mainline excavation for an irrigation water supply system that will draw water from a borehole. The setup involves: 1. Trenching—a long, narrow trench has been dug in the red soil to lay the main water pipeline. 2. Pipeline—blue PVC pipes (110 mm) are placed in the trench to carry water from the borehole to the irrigation field. 3. Borehole connection—the pipe at the far end of the trench leads toward a borehole (not shown), which will pump groundwater into the mainline. 4. Irrigation purpose – The water will be distributed through the mainline to supply an agricultural field for crop irrigation, supporting the Midlands project scheduled for November 2025.

Project Information

Status
Active
Created
January 2, 2026
Images
1 image

Interested in this project?

Get in touch to learn more about our work and how we can help you.

Contact Us