Erection of 4-Legged Elevated Tank Stand for 5000L Capacity Tank, Midlands, November 2025
Project Overview
Scope: Design, fabrication, and installation of a robust elevated tank stand utilizing a 4-legged configuration to support a 5000L capacity tank. Methodology: 1. Pre-construction Activities: - Conduct a thorough site survey and geotechnical assessment to inform foundation design. - Obtain necessary permits and approvals from local authorities. - Mobilize equipment and personnel to site. 2. Site Preparation: - Clear and grub the site. - Excavate and level the area to receive foundations. 3. Foundation Works: - Design and cast reinforced concrete pad foundations for each leg, incorporating anchor bolts. - Allow foundations to cure to specified strength. 4. Structural Steel Fabrication & Installation: - Fabricate steel legs and bracing components in accordance with design drawings. - Erect and level the 4-legged stand, securing to foundations via anchor bolts. - Install cross-bracing and stiffening elements. 5. Tank Installation: - Position and secure the 5000L tank on the elevated stand. - Connect inlet/outlet piping and instrumentation as required. 6. Testing & Commissioning: - Conduct load testing and stability checks. - Hydro-test the tank for leaks. - Commission the system.
Project Information
Interested in this project?
Get in touch to learn more about our work and how we can help you.
Contact Us